Temporary Works Barrier Design Tool
Review temporary barrier performance, compare systems, and calculate site-specific deflection requirements.
Stage 1: Risk Assessment
Selection of barrier always depends upon risk assessment. Complete the risk assessment below to determine the appropriate barrier requirements.
🎯 Design Type Selection
Select the type of design this risk assessment is for. Common risks will be pre-populated based on your selection.
Site Information
Risk Assessment Table
Evaluate each risk factor and assign a severity level (Low, Medium, High, Critical).
📄 Import/Export Risks
Upload risk assessment JSON file or generate from the riskpool.
ℹ️ Formatting Requirements
- PDF must contain a structured risk assessment table
- Columns: Hazard, Impact, Likelihood, Consequence, Controls, Risk Owner
- Use text-based PDFs (not scanned images without OCR)
- Likelihood/Consequence: Use numbers (1-5) or text (Rare, Likely, etc.)
- Best formats: PDF, Word (.docx), or Text (.txt) - PDF recommended
📊 Rating Scales Reference
🎯 Risk Matrix
| Likelihood → Consequence ↓ |
1 Rare |
2 Unlikely |
3 Possible |
4 Likely |
5 Almost Certain |
| 5 Catastrophic | 5 | 10 | 15 | 20 | 25 |
| 4 Major | 4 | 8 | 12 | 16 | 20 |
| 3 Moderate | 3 | 6 | 9 | 12 | 15 |
| 2 Minor | 2 | 4 | 6 | 8 | 10 |
| 1 Insignificant | 1 | 2 | 3 | 4 | 5 |
| S.N. | Hazard / Risk | Impact / Consequence | Likelihood | Consequence | Initial Risk | Risk Controls | Likelihood | Consequence | Residual Risk | Risk Owner | Action |
|---|
Risk Assessment Notes
Add additional notes or observations related to this risk assessment.
Risk Summary
Complete the risk assessment above to view summary.